Tocak-1 HEPP
Location: Antalya
Purpose: Energy
Total Design Discharge: 13.07 m³/s
Net Head: 41.80 m
Total Installed Power: 4.76 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Yurt Enerji