Project Header

Saf-3 Weir and HEPP

Back Back

Saf-3 Weir and HEPP

Location: Bingöl 
Purpose: Energy 
Total Design Discharge: 26.00 m³/s 
Net Head: 99.47 m 
Installed Power: 23.637 MW 
Number of Units: 3 
Turbine Type: Horizontal Axis Francis 
Client: Saf Enerji
×