Sabunsuyu Weir and HEPP
Location: Osmaniye
Purpose: Energy
Total Design Discharge: 6.23 m³/s
Net Head: 132.17 m
Installed Power: 7.55 MW
Number of Units: 2 (1+1)
Turbine Type: Horizontal Axis Francis
Client: Ang Enerji
Purpose: Energy
Total Design Discharge: 6.23 m³/s
Net Head: 132.17 m
Installed Power: 7.55 MW
Number of Units: 2 (1+1)
Turbine Type: Horizontal Axis Francis
Client: Ang Enerji