




Mursal 1 HEPP & Mursal 2 HEPP (Bank Consultant)
Location: Sivas
Purpose: Energy
Installed Power : 4.18 MW + 4.50 MW
Net Head: 272.15 m / 199.70 m
Total Discharge: 1.85 m³/s / 2.72 m³/s
Turbine Type: Horizontal Axis Pelton
Number of Units: 2 / 2
Client: Denizbank
Purpose: Energy
Installed Power : 4.18 MW + 4.50 MW
Net Head: 272.15 m / 199.70 m
Total Discharge: 1.85 m³/s / 2.72 m³/s
Turbine Type: Horizontal Axis Pelton
Number of Units: 2 / 2
Client: Denizbank