|
Project Header

Kirazdere Yuvacık HEPP (Drinking Water Treatment Plant HEPP Project)

Back Back

Kirazdere Yuvacık HEPP (Drinking Water Treatment Plant HEPP Project)

Location: Kocaeli 
Purpose: Energy 
Total Design Discharge: 4.50 m³/s 
Net Head: 38.34 m 
Total Installed Power: 2.30 MW 
Number of Units: 2 
Turbine Type: Horizontal Axis Francis 
Annual Energy Production: 15.00 GWh 
Client: İzaydaş
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top