Kayalık HEPP (Weir & Settling Basin Project)
Location: Erzincan
Purpose: Energy
Flood Discharge: 528.60 m³/s
Weir Height: 14.35 m
Weir Length: 35.00 m
Settling Basin Design Discharge: 11.00 m³/s
Settling Basin Length: 50.00 m
Settling Basin Width: 10.50 m
Client: Akua Enerji Üretim A.Ş.
Purpose: Energy
Flood Discharge: 528.60 m³/s
Weir Height: 14.35 m
Weir Length: 35.00 m
Settling Basin Design Discharge: 11.00 m³/s
Settling Basin Length: 50.00 m
Settling Basin Width: 10.50 m
Client: Akua Enerji Üretim A.Ş.