|
Project Header

Karataş Weir and HEPP

Back Back

Karataş Weir and HEPP

Location: Bingöl 
Purpose: Energy 
Total Design Discharge: 22.00 m³/s 
Net Head: 176.00 m 
Total Installed Power: 34.30 MW 
Number of Units: 3 (2+1) 
Turbine Type: Vertical Axis Francis 
Client: Anadolum Enerji Üretim
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top