




Karasu-2 Weir and HEPP
Location: Erzurum
Purpose: Energy
Total Design Discharge: 15.00 m³/s
Net Head: 22.98 m
Total Installed Power: 3.00 MW
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Akfen Holding
Purpose: Energy
Total Design Discharge: 15.00 m³/s
Net Head: 22.98 m
Total Installed Power: 3.00 MW
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Akfen Holding