|
Project Header

Karasu-2 Weir and HEPP

Back Back

Karasu-2 Weir and HEPP

Location: Erzurum 
Purpose: Energy 
Total Design Discharge: 15.00 m³/s 
Net Head: 22.98 m 
Total Installed Power: 3.00 MW 
Number of Units: 2 
Turbine Type: Horizontal Axis Francis 
Client: Akfen Holding
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top