Project Header

Kanat Weir and HEPP

Back Back

Kanat Weir and HEPP

Location: Giresun 
Purpose: Energy 
Total Design Discharge: 30.00 m³/s 
Net Head: 51.51 m 
Installed Power: 14.06 MW 
Number of Units: 3 (2+1) 
Turbine Type: Vertical Axis Francis 
Client: Türkerler Enerji
×