




Kanat Weir and HEPP
Location: Giresun
Purpose: Energy
Total Design Discharge: 30.00 m³/s
Net Head: 51.51 m
Installed Power: 14.06 MW
Number of Units: 3 (2+1)
Turbine Type: Vertical Axis Francis
Client: Türkerler Enerji
Purpose: Energy
Total Design Discharge: 30.00 m³/s
Net Head: 51.51 m
Installed Power: 14.06 MW
Number of Units: 3 (2+1)
Turbine Type: Vertical Axis Francis
Client: Türkerler Enerji