Horyan Weir and HEPP

Back Back

Horyan Weir and HEPP

Location: Trabzon 
Purpose: Energy 
Total Design Discharge: 3.00 m³/s 
Net Head: 212.44 m 
Installed Power: 6.32 MW 
Number of Units: 2 
Turbine Type: Horizontal Axis Pelton 
Total Energy: 19.00 GWh 
Client: Arsan Enerji A.Ş.
×