Horyan Weir and HEPP
Location: Trabzon
Purpose: Energy
Total Design Discharge: 3.00 m³/s
Net Head: 212.44 m
Installed Power: 6.32 MW
Number of Units: 2
Turbine Type: Horizontal Axis Pelton
Total Energy: 19.00 GWh
Client: Arsan Enerji A.Ş.
Purpose: Energy
Total Design Discharge: 3.00 m³/s
Net Head: 212.44 m
Installed Power: 6.32 MW
Number of Units: 2
Turbine Type: Horizontal Axis Pelton
Total Energy: 19.00 GWh
Client: Arsan Enerji A.Ş.