Location: Nevşehir 
Purpose: Enerji 
Total Discharge: 135.00 m³/s 
Net Head: 4.90 m 
Installed Power: 5.75 MW 
Number of Units: 2 
Turbine Type: Horizontal Axis Kaplan 
Annual Energy Production: 20.77 GWh 
Client: Yapı Kredi
×