|
Project Header

Eğlence-1 HEPP Penstock Support Strengthening Project and Site Supervision

Back Back

Eğlence-1 HEPP Penstock Support Strengthening Project and Site Supervision

Location: Adana 
Purpose: Energy 
Total Design Discharge: 17.40 m³/s 
Penstock Diameter: 2.40 m 
Penstock Length: 1154.00 m 
Client: Enda Enerji Holding
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top