Duru Weir and HEPP

Back Back

Duru Weir and HEPP

Location: Bingöl 
Purpose: Energy 
Total Design Discharge: 75.00 m³/s 
Net Head: 69.15 m 
Installed Power: 47.30 MW 
Number of Units: 3 
Turbine Type: Vertical Axis Francis 
Client: Ağaoğlu Enerji
×