Derebaşı HEPP
Location: Trabzon
Purpose: Energy
Total Design Discharge: 3.20 m³/s
Net Head: 467.17 m
Total Installed Power: 13.41 MW
Number of Units: 2
Turbine Type: Horizontal Axis Pelton
Client: Palmet Holding