|
Project Header

Demirciler Weir and HEPP

Back Back

Demirciler Weir and HEPP

Location: Denizli 
Purpose: Energy 
Weir Type: Electrically Controlled Gated 
Total Design Discharge: 12.00 m³/s 
Net Head: 79.68 m 
Total Installed Power: 8.70 MWm / 8.44 MWe 
Number of Units: 3 (2+1) 
Turbine Type: Horizontal Axis Francis 
Client: Akfen Holding
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top