Demirci Weir and HEPP

Back Back

Demirci Weir and HEPP

Location: Kastamonu 
Purpose: Energy 
Total Design Discharge: 22.70 m³/s 
Net Head: 62.18 m 
Installed Power: 12.87 MW 
Number of Units: 3 
Turbine Type: Horizontal Axis Francis 
Client: Türkerler Enerji
×