|
Project Header

Dağören Weir and HEPP

Back Back

Dağören Weir and HEPP

Location: Hakkari 
Purpose: Energy 
Total Design Discharge: 125.00 m³/s 
Net Head: 54.76 m 
Installed Power: 62.41 MW 
Number of Units: 4 
Turbine Type: Vertical Axis Francis 
Client: Özarsu Elektrik Enerji Üretim A.Ş.
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top