Location: Adıyaman 
Purpose: Energy 
Total Design Discharge: 83.10 m³/s 
Net Head: 23.22 m 
Total Installed Power: 19.11 MW 
Number of Units: 3 
Turbine Type: Vertical Axis Kaplan 