Bedirdüzü-2 Weir and HEPP
Location: Erzincan
Purpose: Energy
Total Design Discharge: 9.10 m³/s
Net Head: 150.53 m
Installed Power: 12.48 MW
Number of Units: 3 (2+1)
Turbine Type: Horizontal Axis Francis
Client: Akgün Enerji Üretim
Purpose: Energy
Total Design Discharge: 9.10 m³/s
Net Head: 150.53 m
Installed Power: 12.48 MW
Number of Units: 3 (2+1)
Turbine Type: Horizontal Axis Francis
Client: Akgün Enerji Üretim