Başköy Weir and HEPP
Location: Erzurum – Bingöl
Purpose: Energy
Total Design Discharge: 14.50 m³/s
Net Head: 253.90 m
Total Installed Power: 33.22 MW
Number of Units: 3
Turbine Type: Horizontal Axis Francis
Client: Anadolum Enerji Üretim