|
Project Header

Başderviş Pond and Irrigation Network

Back Back

Başderviş Pond and Irrigation Network

Location: Kahramanmaraş 
Body Type: Homogeneous Earthfill 
Dam Body Height: 24.55 m 
Crest Length: 163.40 m 
Total Body Volume: 152366 m³ 
Spillway Capacity: 44.53 m³/s 
Derivation Length: 191.52 m 
Irrigation Area: 187.00 ha (gross) / 163.00 ha (net) 
Irrigation Module: 0.67 l/s/ha 
Irrigation Network Type: Pressured Line 
Client: DSI – General Directorate of State Hydraulic Works
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top