|
Project Header

Balıklı-1-2-3 HEPPs

Back Back

Balıklı-1-2-3 HEPPs

Location: Artvin 
Purpose: Energy 
Total Design Discharge: 1.80 m³/s – 4.40 m³/s – 2.00 m³/s 
Net Head: 127.47 m 
Total Installed Power: 6.75 MW 
Number of Units: 3 
Turbine Type: Horizontal Axis Francis 
Client: Assu Elektrik Enerji
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top