Ayrancılar Weir and HEPP
Location: Van
Purpose: Energy
Total Design Discharge: 17.00 m³/s
Net Head: 185.48 m
Installed Power: 28.65 MWm / 28.08 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Total Energy: 117.11.00 GWh
Client: Muradiye Elektrik Üretim A.Ş.