Aladağ Weir and HEPP
Location: Bolu
Purpose: Energy
Total Design Discharge: 7.00 m³/s
Net Head: 92.05 m
Installed Power: 5.88 MW
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: YCK İnşaat Enerji