|
Project Header

Yıldırım Weir and HEPP

Back Back

Yıldırım Weir and HEPP

Location: Bayburt 
Purpose: Energy 
Total Design Discharge: 18.00 m³/s 
Net Head: 67.46 m 
Total Installed Power: 11.01 MWm / 10.677 MWe 
Number of Units: 3 
Turbine Type: Horizontal Axis Francis 
Client: Bayburt Enerji A.Ş.
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top