Yayla Weir and HEPP
Location: Artvin
Purpose: Energy
Total Design Discharge: 21.00 m³/s
Net Head: 25.98 m
Installed Power: 4.91 MWm / 4.67 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Total Energy: 20.87 GWh