




Saraçbendi Weir and HEPP
Location: Sivas
Purpose: Energy Weir Type: Without Gate Mass-Body
Design Flood Discharge: 1.269.50 m³/s
Net Head: 32.04 m
Installed Power: 26.30 MWm
Number of Units: 4
Turbine Type: Vertical Axis Francis
Annual Energy Production: 81.31 GWh
Client: Akfen Holding
Purpose: Energy Weir Type: Without Gate Mass-Body
Design Flood Discharge: 1.269.50 m³/s
Net Head: 32.04 m
Installed Power: 26.30 MWm
Number of Units: 4
Turbine Type: Vertical Axis Francis
Annual Energy Production: 81.31 GWh
Client: Akfen Holding