Ören Weir and HEPP
Location: Giresun
Purpose: Energy
Total Design Discharge: 20.00 m³/s
Net Head: 153.64 m
Installed Power: 27.896 MW
Number of Units: 4
Turbine Type: Horizontal Axis Francis
Total Energy: 61.72 GWh
Client: Çelikler Holding
Purpose: Energy
Total Design Discharge: 20.00 m³/s
Net Head: 153.64 m
Installed Power: 27.896 MW
Number of Units: 4
Turbine Type: Horizontal Axis Francis
Total Energy: 61.72 GWh
Client: Çelikler Holding