Köprübaşı Weir & HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Location: Trabzon 
Purpose: Energy 
Total Design Discharge: 7.50 m³/s 
Net Head: 126.00 m 
Total Installed Power: 8.195 MWm / 7.949 MWe 
Number of Units: 2 
Turbine Type: Horizontal Axis Francis 
Client: Gama Enerji
×