Köprübaşı Weir & HEPP Technical Due Diligence and Consulting for Hepp Acquisition
Location: Trabzon
Purpose: Energy
Total Design Discharge: 7.50 m³/s
Net Head: 126.00 m
Total Installed Power: 8.195 MWm / 7.949 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Gama Enerji