




Kıran Weir and HEPP
Location: Giresun
Purpose: Energy
Weir Type: Electrically Controlled Gated
Total Design Discharge: 22.00 m³/s
Net Head: 49.31 m
Total Installed Power: 9.94 MW
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Arsan Enerji A.Ş.
Purpose: Energy
Weir Type: Electrically Controlled Gated
Total Design Discharge: 22.00 m³/s
Net Head: 49.31 m
Total Installed Power: 9.94 MW
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Client: Arsan Enerji A.Ş.