Gök Weir and HEPP
Location: Bilecik
Purpose: Energy
Weir Type: Gated
Design Discharge: 135.00 m³/s
Net Head: 10.68 m
Installed Power: 13.30 MWm / 12.64 MWe
Number of Units: 2 Turbine
Type: Horizontal Axis Kaplan
Annual Energy Production: 52.73 GWh
Client: Gülsan Holding