Derya-2 Weir and HEPP
Location: Gümüşhane
Purpose: Energy
Weir Type: Gated
Design Discharge: 34.15 m³/s
Net Head: 72.68 m
Installed Power: 17.61 MWm / 16.91 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Annual Energy Production: 81.31 GWh
Client: Gülsan Holding
Purpose: Energy
Weir Type: Gated
Design Discharge: 34.15 m³/s
Net Head: 72.68 m
Installed Power: 17.61 MWm / 16.91 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Annual Energy Production: 81.31 GWh
Client: Gülsan Holding