|
Project Header

Derya-2 Weir and HEPP

Back Back

Derya-2 Weir and HEPP

Location: Gümüşhane 
Purpose: Energy 
Weir Type: Gated 
Design Discharge: 34.15 m³/s 
Net Head: 72.68 m 
Installed Power: 17.61 MWm / 16.91 MWe 
Number of Units: 3 
Turbine Type: Vertical Axis Francis 
Annual Energy Production: 81.31 GWh 
Client: Gülsan Holding
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top