Çine Adnan Menderes Dam and HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Back Back

Çine Adnan Menderes Dam and HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Location: Aydın 
Purpose: Energy 
Body Type: R.C.C. 
Body Height: 135.00 m 
Total Storage Capacity: 350.00 hm³ 
Installed Power: 45.54 MWm / 44.65 MWe 
Number of Units: 2 
Turbine Type: Vertical Axis Francis 
Design Discharge: 17.50 m³/s 
Annual Energy Production: 45.00 GWh 
Client: Fina Enerji Holding
×