Çine Adnan Menderes Dam and HEPP Technical Due Diligence and Consulting for Hepp Acquisition
Location: Aydın
Purpose: Energy
Body Type: R.C.C.
Body Height: 135.00 m
Total Storage Capacity: 350.00 hm³
Installed Power: 45.54 MWm / 44.65 MWe
Number of Units: 2
Turbine Type: Vertical Axis Francis
Design Discharge: 17.50 m³/s
Annual Energy Production: 45.00 GWh
Client: Fina Enerji Holding