Akçay Hydroelectric Power Plant
Location: Aydın
Purpose: Energy
Total Design Discharge: 36.00 m³/s
Net Head: 88.86 m
Installed Power: 31.98 MWm / 28.78 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Total Energy: 77.00 GWh
Client: Enda Enerji Holding
Purpose: Energy
Total Design Discharge: 36.00 m³/s
Net Head: 88.86 m
Installed Power: 31.98 MWm / 28.78 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Total Energy: 77.00 GWh
Client: Enda Enerji Holding