




Akçaova River Flood Control Project
Location: Ordu
Purpose: Flood Control
Stream Length: 2025.00 m
Flood Discharge: 314.00 m³/s
Client: DSI – General Directorate of State Hydraulic Works
Purpose: Flood Control
Stream Length: 2025.00 m
Flood Discharge: 314.00 m³/s
Client: DSI – General Directorate of State Hydraulic Works